PROJECTS​

A few examples of finished projects

Equipment and Pilot Plant Design

Turn Key 1000L Pilot Plant Installation

Design, construction and commissioning of a pilot plant for a newly developed process exactly to the customers requirements. The design is skid-based and includes the plant automation. The plant was handed over to the customer ready-to-run including remote monitoring capabilities elminating the need for a continuous on-site process operator.

3 Liter Lab Reactor

A flexible, highly configurable, and fully instrumented stirred 3 liter reactor. This is a high-pressure (220 bar) and high-temperature (350 C) reactor for extreme reaction conditions. It was designed complete with heating, cooling coils, gas connections, vacuum pump, and process control with data logging.

Skid based melting station

Construction and installation of a innovative system to melt used fats. The system consists of an external skid mounted heating station feeding spray nozzles in a traditional melting tank. This cuts melting times by 75% compared to traditional melting tanks with coils and a circulation pump.

Filter Aid Dosing System

Complete design of a filter-aid dosing system for the preparation of a slurry used in the winterization of oils. This includes the engineering and operational aspects as well as the complex dimensioning of the pneumatic powder transport ensuring accurate clog-free dosing every time.

Process Development & Optimization

Novel Process Design

We developed a novel process for the valorization of by-products by converting them into new raw materials for further processing. All aspects, from process concept to engineering details (e.g. heat- and mass transfer, chemical reaction kinetics) were researched and delivered to our client resulting in a much higher added value raw-material stream than previously possible.

Oil Winterization Support

We analyzed and optimized an existing winterization process. All processing and dosing parameters where investigated and adjusted to get an optimal result. In this case, we were able to increase the capacity of the existing winterization equipment by over 300%!

Facing a similar challenge?
Interested in finding effective solutions for your organization?

Scroll to Top